Wednesday, July 20, 2011

How did the hardwood floor installer eliminate a T-joint halfway down the hallway or at the end of the runs?

He probably started on one of the walls in the hallway. If not the only other option would have been to back lay it. When planning layout for engineered you need to plan for as little back laying as possible. Most times you can avoid it completely.

No comments:

Post a Comment